Process Quiz
10 questions/11 slides
PLAY QUIZ
Process Quiz

Create a Quiz
Create interactive quizzes with real-time questions and answers. Keep your audience engaged with instant feedback and live leaderboards. Use AI assistance to create quizzes quickly and easily.
Learn more…

Host Live Quiz Game
Host a live game and watch answers pop up in real time. Track every participant's score, announce winners, and celebrate top performers. Anyone can join by scanning a QR code or entering a game code.
QUESTIONS IN THIS QUIZ
According to the safety protocol, which action is mandatory for contamination control before the operator enters the room?
- Logging the room temperature on the monitor.
- Applying a high-tack roller to clothing.
- Completing the air shower.
- Applying a new hairnet.
Which of the following parameters, when set on the HMI, controls the final density and tightness of the wound element?
- Speed
- Element Pressing Force (BEL)
- Element Thickness (HEL)
- Mandrel Diameter
What is the primary material used as the 'dielectric film' that provides insulation in the wound element?
- Aluminum Foil
- Polypropylene Film
- Copper Foil
- Polyester Film
During the Post-Winding Dimensional Check, what quality metric is verified to ensure the insulating film extends past the conductive electrode?
- Margin
- Foil Projection
- Element Thickness (HEL)
- Active Width
What is the primary function of the Element Weight check using the weighing machine?
- To determine the Element Pressing Force (BEL) setting.
- To verify the Foil Projection value.
- To measure the KV discharge rate.
- To confirm the correct usage of all raw materials against a theoretical target.
Why is it mandatory for operators to confirm they are wearing no bangles, no chains, and have long hair secured?
- To minimize the risk of fire from static charge buildup.
- To reduce the element's mass during the weight check.
- To prevent entanglement with precision winding machinery.
- To comply with the 5S Shine principle.
What is the main objective of the 'Dry Test Voltage Machine' performing a high-voltage test with a controlled ramp time?
- To verify the Element Pressing Force (BEL) is correct.
- To confirm the correct Mandrel Diameter was used for winding.
- To force out hidden foreign particles or weak spots in the dielectric film.
- To measure the overall Element Thickness (HEL) accurately.
The first step in the entire process, before any physical work or machine setup, is to perform which administrative task?
- Input the YC Number into the HMI.
- Execute the Take 5 Safety Pause.
- Check the Job Card specification given by the customer.
- Log the Room Temperature and Humidity.
What happens to the Dry Test Voltage and the element during the 'Ramp Time'?
- The voltage is immediately discharged to measure the KV output.
- The machine automatically adjusts the Mandrel Diameter to a new value.
- The voltage is held constant while the element cools down.
- The voltage increases steadily while the element is simultaneously flattened by the press.
During the Take 5 Safety Pause, which step confirms the cleanliness and organization standard of the work area?
- Reviewing the Foil Projection measurement.
- Logging the YC Number.
- Confirmation of the 5S workplace being done.
- Verifying the Element Thickness (HEL).
PLAY QUIZ
Process Quiz
